Token-based system • 1 token = 1 connection × 1 load combination
For small to mid-size projects
For broad simulation roll-outs
Understand how tokens map to your project needs
Contact us for a customized ROI analysis for your specific project →
Additional capabilities available through token packages or custom licensing
Unlock beam-column, column base, or other standard connection types. Requires additional token allocation or licensing.
Add HEB, IPE, or other section families to your existing connection types. Contact us for token requirements.
We'll train a model for your specific non-standard connection geometry. Custom licensing and token packages available.
Add American steel design code support to your account. Requires specialized token package - contact sales for details.
Contact us to discuss expansion options and token requirements →
1 token = 1 connection × 1 load combination. Example: 200 connections with 5 load cases = 1,000 tokens.
Token validity periods are flexible and determined by your package. Contact us to discuss options that fit your project timeline.
All data encrypted in transit (TLS 1.3) and at rest (AES-256). EU-based servers, GDPR compliant.
Yes! Organizations with high-volume needs receive custom pricing with significant discounts. Contact sales for a tailored quote.
Universities and research institutions receive special academic pricing. Verification required - contact us for details.
Unused tokens can be refunded within 30 days of purchase, minus any tokens already consumed.
Try our interactive demo or contact us for custom enterprise solutions
No credit card required • Instant access to demo • Custom pricing available
Results produced by ConnectAI are for preliminary design and feasibility assessment only. Final connection design and code-compliance verification must be performed by a licensed structural engineer using full FEM analysis in accordance with the applicable code (EN 1993-1-8 or equivalent). ConnectAI accepts no liability for connections implemented without independent verification.
Recommended usage: Use ConnectAI for preliminary design, option comparison, and bid preparation. Any FAIL result or resistance between 100-105% must be verified with full FEM before finalisation.